Loading color scheme

2016

In 2016 we invested again in a new CNC milling machine to achieve faster and easier mechanical processing.

In September we extended our production area again by 825m². This is mainly used for storing and cutting raw materials. Thus, our total production area is now about 2100m². The final assembly of the plants is also located in the new hall, as machines with a dead weight of up to 15 tons are already being manufactured and the new production facility has made loading onto trucks much easier.